Facebook
Facebook
Twitter
Twitter
LinkedIn
LinkedIn
Email
Email
0 Comments
Comments
"The guides had a route to follow, and we tried to limit group size to six, so everyone could hear what was being said. The route through the operation followed how work would flow. In the warehouse, we had some refreshments.
"The production manager scheduled jobs that worked through most of the equipment. There were demos set up at equipment that wasn't being used that particular day.
0 Comments
View Comments
- Companies:
- Xerox Corp.
Related Content
Comments